
OneSubsea CD designs, installs and maintains subsea production systems (SPS) and SURF for Central Africa. From wellhead to FPSO – 40% faster tie-backs, 25-year design life, zero-flare ready.
Cut hydraulic fluid, cut OPEX by 32%, enable CO2 storage ready wells. Deployed from Pointe-Noire yard in 11 months.
See technologyOneSubsea CD is the Congolese hub for subsea production excellence. We combine global SPS engineering with local fabrication, vessels and talent in Pointe-Noire and Muanda. Our mission: unlock Congo Basin reserves with the lowest carbon per barrel in Africa.
We own the full stack: front-end engineering, trees, manifolds, jumpers, umbilicals, installation vessels, commissioning and 25-year IMR. No handovers, no gaps.
Trees, wellheads, manifolds, connection systems, controls – qualified to 3000m, 15k psi, sour service.
Rigid & flexible flowlines, umbilicals, risers, heavy-lift installation with dynamically positioned vessels.
IMR, ROV, well intervention, digital twin, predictive maintenance – maximizing recovery to 48%.
One contract, one team, one digital twin. FEED, EPCI, commissioning and 25-year support for greenfields, tie-backs and brownfield upgrades.

Moho-style 8-well clusters, 120km umbilicals, FPSO integration. Standard design cuts CAPEX 28%.

Pre-engineered jumpers, reusable templates, vessel sharing pool from Pointe-Noire – first oil in 9 months.
Real-time flow assurance, sand, corrosion, virtual metering. Hosted in Kinshasa data hub.
Work-class ROVs, light well intervention, inspection campaigns year-round in Congo waters.
All-electric trees, subsea boosting to avoid topside power, CO2 injection well design.
hyperbaric + SIT yard, FAT/SIT witnessed by clients, 10k pressure testing.
Subsea Academy Pointe-Noire: ROV pilots, assembly technicians, HSE – 340 graduates.
Quayside 180m, 12t/m2, spooling, storage of trees & umbilical reels, customs clearance.
Hydraulics are history. Our e-tree uses 100% electric actuation, subsea batteries and fiber-optic sensing – 40% fewer topside umbilical cores, zero discharge.
• 15,000 psi, -2°C to 150°C
• Electric chokes, downhole gauges
• 30-year design, retrievable modules by ROV
• CO2 & hydrogen ready seals

Distributed acoustic sensing on flowlines detects leaks in 12 sec. AI predicts hydrate plugs 14 days ahead. Dashboard in French & English.


First oil 11 months early. 98.7% uptime, 42% local fabrication.

Standard jumper pool saved $18M. Commissioned in 7 months without shutdown.

Annual ROV, pigging, wellhead maintenance for 3 operators. Digital reporting.
Free screening study for Congo blocks – reservoir, distance, flow assurance in 10 days.
Engineering notes, project milestones, technology launches and local content stories. Click any story to open full article.
Subsea boosting eliminates 2 gas turbines per field. All-electric controls cut venting to zero. We monitor methane with fiber + satellite and design every template CCS-ready.
Response in 24h – English / French. Base Pointe-Noire, office Kinshasa.
Send request →Zone Industrielle, Quai Subsea, Pointe-Noire – 180m quayside, SIT pit, ROV hangar. Open Mon-Sat 7:00-18:00.
Boulevard du 30 Juin, Gombe, Kinshasa – engineering, permits, local content & training.
projects at onesubsea.cd domain – RFQ, vendor registration, careers. Response 24h.